Factory Audi Ingolstadt
Plant steelwork with two intermediate platforms for the installation of paint booths and ventilation units.
On the upper level are 4 ventilation chimneys with a diameter of 1,100mm and a height of 12.60m.
To keep the transverse vibrations of the chimneys small, the chimneys were equipped with Scrouton helixes.